Undertaking new projects for the 02 bid section of the south extension line of Wuxi Metro Line 1

2025-11-05 11:00

pexels-photo-169677.jpeg


Beautiful Wuxi, building dreams with me.


Shanghai Yechao assisted China Railway Shanghai Engineering Bureau in the construction of the 02 section of the southern extension of Wuxi Metro Line 1, which is under the protection of the driver.


The left line of the shield tunneling section from Wanda City Station to Nanquan Station on the southern extension of Wuxi Metro Line 1, constructed by China Railway Shanghai Engineering Bureau, has successfully started at the foot of Xuelang Mountain in Wanda Cultural Tourism City. This is another shield tunneling machine starting from the right line on June 16th, and also the last shield tunneling section of Line 1 Phase II project. This shield tunneling marks the comprehensive entry of Line 1 Phase II project into the excavation construction stage.


In order to ensure the smooth launch of the shield tunneling machine, all the employees of Shanghai Yechao Project Department worked together with full enthusiasm in a short period of time to successfully complete the construction process of the shield tunneling machine.


It is reported that the total length of the left line of the shield tunnel section from Wanda City Station to Nanquan Station is about 1555.777 meters. The tunnel passes through soil layers mainly composed of clayey silt and silty clay. A Herrenknecht earth pressure balance shield machine is used for excavation construction, starting from the west end of Wanda City Station. After completing the minimum radius turns of 600 meters and 350 meters in the section, it has now been received.

Address:No. 4645 Cao'an Road, Jiading District, Shanghai
Tel:86-021-66082406 66082407
Fax:86-021-66082405
新巴尔虎左旗| 神木县| 南乐县| 静海县| SHOW| 舟山市| 建宁县| 松原市| 花莲市| 皋兰县| 古蔺县| 广德县| 车致| 洱源县| 金门县| 永济市| 旬阳县| 社旗县| 娱乐| 盐边县| 苍南县| 天水市| 黄石市| 迁西县| 庆云县| 车致| 湖南省| 石景山区| 云南省| 东辽县| 罗甸县| 河东区| 荣成市| 沐川县| 云梦县| 长宁区| 湘乡市| 沽源县| 寿光市| 浦县| 库尔勒市|